Due to the closeness of the refit team and store staff during this project there were many elements that the guys delivered for the store, from handing back areas ahead of the handover date so that the store could trade quicker to actioning requests such as moving shelves and pictures in the back of house.
Perimeter panel changes and alterations
Sales floor columns stripped back and re-panelled
Alterations to cash desk including installation of over 30 self checkouts and reduction in served tills.
Redecoration to several windowbeds
New signage installed throughout
Two fitting rooms phases complete.
New walkways installed on salesfloor
BOH alterations including the building of new training room
Full decoration to back of house
Full flooring replacement to both areas.
The team formed such a close relationship with the store staff that they had a group chat for daily communication, this was highlighted at the end of the job by the store managers Jason and Roz.
This particular job threw up a challenge from day 1, the team were completing perimeter panel changes and noticed that the existing system was not sufficiently fixed back to the wall making the area unsafe to stock product.
We had to adapt and refix the entire perimeter system to ensure this was safe and test each of the fixings once secured to confirm that the area was safe for the store to stock product.